Warning: array_values() expects parameter 1 to be array, null given in /home/a0129/domains/novasiria.it/public_html/wp-content/themes/novasiria/templates/case-study.php on line 7

Jointing

  • Installation: Desalination plant
  • Repair needed: Jointing
AWT/RAWAFID JV - Advanced Water Technologies and RAWAFID are responsible for the EPC Contract for the Khafji SWRO Desalination Plant. The owner of the plant is KACST. The Khafji SWRO Desalination Plant is located approximately 4km south east of the Kuwait border on the Arabian Gulf coast of the Kingdom of Saudi Arabia. Artelia performed the complete marine studies and detailed engineering for the intake and outfall system. The seawater intake pumping station has a design capacity of 13,830 cubic meters per hour. The seawater is abstracted from the sea by offshore intake head structures and transferred to the onshore seawater intake pumping station by three 5km subsea pipelines.