The installation carried out by Nova Siria last April, at the aqueduct of Tortona (AL), has been a complex one. The project consisted in a DN 500 PN 10 tap valve insertion in a DN 800 PE pipeline, creating a DN 600 derivation on the same DN 800 pipeline. In addition to this, a DN 200 by-pass was needed in the same place, in order to carry out some connections for residences located close to the site.